﻿David Sync — 07/16/2026 Summary
Meeting Summary
This was primarily a "download" session with David (Naked Heart, the hub's power/infrastructure provider), focused on transferring the how-to knowledge behind parts that have already been sourced. Jarrett Henson was introduced as new build muscle (welding, keter rails, electrical), and David immediately clicked with him. The camp is behind schedule but showing real motion. David's core message: the parts have been gathered, but the instructions on assembly hadn't been delivered yet — which is why the build team felt lost.
Key technical downloads covered: the fresh water pump system (SureFlo/Little Giant pumps sit on the ground, braided hoses stay permanently attached, downstream is all garden-hose tech), the electrical backbone (David supplies 70-amp/5-gauge feeds terminating in Edison duplex mobile panels; camp runs 10-gauge for internal distribution), the keter rail installation on the semi trailer, dormitory shade stakes/washers, float switches and gray water pumps, water risers, and the IBC-to-pump transition hose.
The hard deadline driving everything: the semi trailer must ship to Nevada in early August, so anything that goes in or on it (keter rail, dormitory shade hardware, IBCs, shower, fresh/gray water gear) is chronologically top priority. The kitchen trailer ships later and is lower priority — David explicitly told the team not to over-engineer it and to focus on meeting obligations to paying campers first.
________________


Action Items — David (Naked Heart)
* Look up and list the hydraulic hose shop (Longmont/Boulder area) on the agenda tab so the team can contact them today/tomorrow for the IBC transition hoses.
* Reach out about onward semi delivery logistics to make sure the camp doesn't get "backed into a corner" finding a driver.
   * Follow up with person who drove semi trailer from NJ to CO (get contact from jeremy)
* Confirm how much power the camp needs so he can budget power for the whole hub.
* Provide part numbers for 10-gauge extension cords / triple taps if the team wants them (he offered, but pushed the legwork back to the team).
* Continue updating the master list "homework" column and build out next week's agenda tab — his primary channels for communicating.
* Send the five-gauge 70-amp feeds (at least two: one near kitchen, one near dormitory).
* Available for further "downloads" on any system by phone when the team is actively building.


________________


Action Items — Terrible Turtle Team
Jade:
* Fix the site layout map: rotate the kitchen trailer to right angles to the semi (don't block the semi doors), position closest to the adjoining camp.
* Share the master list view with Jarrett.
* Send the Alps/Himalayas document + summary doc to the build team via WhatsApp (was only sent to Jarrett).
* Give David a heads-up before build days so he keeps his ringer on for questions.
* Send photos of completed items (fruit box, E-track, shower).
* Confirm the chest freezer order (Frigidaire 20 cu ft or GE — David approved either; stop waiting on the frozen-food calc).
Jarrett:
* Cut keter rail so ends land on rivets/logistics bars; tap both end sections extra carefully (failure starts at ends), ease slot openings into a 45° V-notch with 80-grit, align all slots for the bolt rope.
* Weld washers ¼ inch below stake heads.
* Wire fresh water pump (blue butt crimps, staggered, adhesive heat-shrink over connections).
* Mount E-track with self-drilling screws — watch screw length (1½" may punch through 1" box tubing).
* Try to re-contact the Key West truck driver (may come in August, saves money).
* Build the IBC transition hoses at the hydraulic shop once David lists it.
Jeremy:
* Make/finish the float switch weights (2"×2" angle iron, ~6", drilled + #10 screws).
* Pay the balance of the RV invoice (Venmo trouble — David wants "another six").
* Has the truck driver's contact.
Team-wide / this-week goals:
* Finish vegetable cold box — lid lifts off, does NOT hinge (foam walls, hexi-tape corners, 2" walls / 3" lid with registration pieces glued on). Note: the AI-generated hinge design was wrong per David — corrected in-meeting.
* Finish E-track (today), shower (tomorrow).
* Prioritize welding stakes + keter rails + shade-parts inventory before anything else.
* Test the trailer hitch (untested — flagged as a concern).
* Register the box truck and get cab time driving hills, then with the trailer loaded.
* Goal: 100% of infrastructure done by end of next week so the semi ships early August.
________________


Things to Get / Source (discussed in meeting)
Fresh water system
* 5/8" reinforced garden hose, 100-ft lengths, kink-resistant, decent quality (don't cheap out) — buy extra
* ½" male pipe → male garden hose adapters (for pump outlet)
* Garden hose Y-splitters with on/off valves on each leg
* Confirm receipt of line 162 in-and-out braided hoses (believed at the Gulch/in the pod)
Electrical
* 10-gauge extension cords, 100-ft (not yet purchased — line 245)
* 10-gauge triple taps (male plug → three female receptacles; preserves capacity)
* RV shore-power adapter (30-amp standard, which adapts to household outlet) to plug the kitchen trailer into David's duplex
Gray water / shower
* Cattle troughs / water basins (2+ side by side; at least one longer than the shower for extra catch basin) — pick up from store
* Gray-water hoses: twin 50-ft lengths preferred over 100-ft; buy double what you think you need; mark one "waste"
* 42-gallon Brute garbage cans (for coiling/storing hoses)
* Harbor Freight or Little Giant utility pumps + Little Giant float switches (already partly ordered)
* 2"×2" angle iron for float-switch weights
IBC transition hose (at hydraulic shop)
* 2" male cam lock fittings (×2, one per IBC)
* Female cam lock fittings
* ~10-ft 2" reinforced vinyl potable-water hose, ¾" tee, close nipples, two ball valves, ¾" male-to-garden-hose ends, 2"→¾" reducer
Dormitory shade
* Concrete stakes + washers (ordered 80; weld 60, keep ≥8 unwelded as location pins; make extras) — orange paint for stake tops
* Verify against Alps/Himalayas doc, master list lines 55–67
Kitchen (lower priority)
* Chest freezer (Frigidaire 20 cu ft or GE — approved)
* 3× fridges (~4-6 amps each — already linked/correct), produce cooler
* 4-6" trifold mattresses (brand TBD; wait until camper population firms up)
* Tools flagged on master list (e.g., 1" auger for pole bases, line 101)